HomeCase studiesDemtroys
Demtroys · Supplier-reported case study
Allied Toronto heating study
A Demtroys case study from an electrically heated Allied building in Toronto.
The building
- Category
- Low-rise
- Units
- 24
- Levels
- 9
- Living area
- 6,658 m²
- Heating
- Electric
Context and challenge
Allied creates Class I workspaces across Canada. Demtroys saw an opportunity to help it save energy at scale.
Allied chose to install an energy management system in one of its buildings in Toronto, a nine-level, electrically heated building with 24 units.
Solution
Allied installed the Demtroys energy management system in the building. The study reports the result of the system as a whole, without listing individual components.
Demtroys states that ten further systems were installed in Allied buildings over the following two years.
Results
Demtroys compared the consumption measured during the reporting period with a theoretical consumption for the same building without the energy management system. The difference is reported as avoided energy consumption.
The theoretical consumption was adjusted for the conditions that prevailed during the reporting period, such as outdoor temperature.
- This is a comparison with an adjusted estimate. It is not a raw before-and-after comparison of bills.
- The study reports one building. It does not describe results across Allied's other buildings.
Source
This case study is published by Demtroys. The figures are Demtroys's own and are shown with the scope the study reports. It is not a project delivered by Cool Estate.
Case study, Commercial (PDF, demtroys.com) (opens in a new tab)
Assess your building
We can talk through the Demtroys system, how it is assessed and what a building like yours would need.